
Line Marking Phillip
Carparks • Commercial • Warehouses • Loading Docks
Professional line marking across Phillip and the Woden town centre precinct. Commercial carparks, retail spaces, government facilities. AS/NZS compliant. We travel to the ACT for projects of all sizes.
Fast Quote Turnaround
Upload your site plans and receive a fixed-price quote within 48 hours.
AS/NZS Compliant
Fully Insured
15+ Years Experience
Get FREE Quote
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ Businesses
Trusted by Major Australian Operators



Why Phillip Businesses Trust Us?
Phillip is part of Canberra's Woden town centre with significant government and commercial activity. A government department's building needed their basement carpark upgraded for accessibility compliance. The existing accessible bays didn't meet current AS/NZS 2890.6 shared space requirements, and an audit had flagged the deficiencies. We staged the work over multiple nights to maintain access for essential staff. Removed non-compliant markings and applied new accessible bays with proper shared space allocations. Used fast-cure thermoplastic so each section was ready for morning arrivals. The accessibility audit passed with zero deficiencies. Phillip houses many government agencies. We've learned that government facilities often have specific accessibility and documentation requirements that exceed standard commercial projects.
Key Benefits
Hundreds of projects completed across Australia
We travel to Canberra regularly
Zero disruption to your operations
AS/NZS compliant documentation provided
Fixed-price quotes within 48 hours

Line Marking Services in Phillip
From carparks to government facilities, commercial to retail. Whatever you need marked, we've got you covered.

Carpark Line Marking
AS/NZS 2890 compliant bays, accessible parking at proper 3.2m widths in Phillip. Most projects done over weekends so you stay open.

Warehouse & Factory Marking
Forklift lanes, pedestrian walkways, hazard zones in Phillip. Two-pack epoxy for high-traffic areas. Scheduled for zero downtime.

Road & Traffic Line Marking
Centre lines, crossings, stop bars in Phillip. AS 1742 compliant. VicRoads approved. Thermoplastic lasts 5-8 years, not 18 months.

Line Marking Removal
Complete removal using grinding or 3500 PSI water blasting in Phillip. No ghost lines bleeding through your new layout.

Playground & Sports Court Marking
Courts, games, hopscotch in Phillip. 12 standard colours or custom matched to your school. Done during holidays, not term time.

Thermoplastic Markings
When paint needs replacing every 18 months, thermoplastic keeps performing for years in Phillip.

Factory Floor line Marking
Professional factory floor marking for 5S lean manufacturing, and machine areas in Phillip. Chemical-resistant epoxy options. WHS compliant. Upload plans for quote.

School Playground Line Marking
Professional school playground line marking across Phillip. Games, sports zones, play areas, educational markings. Upload plans for detailed quote today.

Airport Line Marking
Specialist airport line marking to CASA Part 139 MOS standards in Phillip. Runways, taxiways, aprons, and airside roads. ASIC cleared crews. Upload plans for quote.
Ready to Get Your Free Quote?
Upload your site plans and receive a fixed-price quote within 48 hours. No call-out fees.
Our Recent Projects

Carpark Re-Line & Accessible Bays
15/03/2024

Council Road & Traffic Marking
22/11/2024

Full Surface Line Removal
10/10/2024

Warehouse Safety Upgrade
28/09/2024

School Playground Repainting
15/08/2024

Site Compliance Audit & Corrections
03/07/2024
Frequently Asked Questions
Yes. We service Canberra and the ACT regularly. Phillip and Woden are central locations that we can combine with other ACT work. Contact us to discuss your timing.
Projects can typically be scheduled within 1-2 weeks. Government work may have specific procurement requirements. Upload your plans and we'll confirm timing.
We handle everything: government buildings, commercial carparks, accessibility compliance, warehouse floor marking, pedestrian walkways, loading zones, and basement carpark systems. If it needs a line, we mark it.
Every job meets AS/NZS 2890.1 for carparks, AS/NZS 2890.6 for accessible parking, AS 1742 for roads, and current accessibility requirements. Full compliance documentation provided.
Depends on conditions. For basement carparks protected from weather, our thermoplastic systems last 4-6 years. External areas may vary. We'll recommend the right product.
Yes. Upload your site plans (PDF, CAD, or photos) and we can quote most jobs within 48 hours without visiting. For complex projects, we can arrange a site inspection.
Canberra Areas We Service
Line Marking Across Australian Capital Territory
More Services Near Phillip
Professional line marking services across Canberra and surrounding areas
Browse all Canberra services:
Ready to Get Your Line Marking Sorted?
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call James directly: 0468 069 002