Certified & Compliant
AS/NZS 2890, AS 1742 compliant. VicRoads approved. Documentation included.

Faded lines? Compliance concerns? We've completed over 5,000 carparks, warehouses, and roads since 2009. Upload your site plan and get a fixed-price quote within 48 hours. Fixed pricing. No surprises.
After Hours? Weekends? Emergency? We're ready 24/7
AS/NZS Compliant
$20M Insured
Since 2009
Fixed-Price Quote Within 48 Hours
Trusted by 5,000+ Businesses



AS/NZS 2890.1 compliant markings with proper 3.2m bay widths prevent slips, trips, and collisions
Avoid $4,800+ council fines for non-compliant accessible parking under AS/NZS 2890.6
A Laverton North shopping centre saw parking complaints drop 80% after we remarked 650 bays
Most projects completed in 1-3 nights. 2,400 linear metres finished in eight hours for one Campbellfield warehouse
Three Dandenong South facilities copped $4,800+ fines last year. We measure twice, mark once, document everything to AS/NZS 2890.6.
2,400 metres in eight hours. Most projects wrap in 1-3 nights with zero operational downtime for your facility.
Grade A thermoplastic lasts 6-8 years. We learned this the hard way in 2018 when cheaper materials failed after two summers.
From car parks to warehouses, we deliver precision marking that keeps your workspace safe and compliant

AS/NZS 2890 compliant bays, accessible parking at proper 3.2m widths. Most projects done over weekends so you stay open.

Centre lines, crossings, stop bars. AS 1742 compliant. VicRoads approved. Thermoplastic lasts 5-8 years, not 18 months.

Complete removal using grinding or 3500 PSI water blasting. No ghost lines bleeding through your new layout.

Forklift lanes, pedestrian walkways, hazard zones. Two-pack epoxy for high-traffic areas. Scheduled for zero downtime.

Courts, games, hopscotch. 12 standard colours or custom matched to your school. Done during holidays, not term time.

When paint needs replacing every 18 months, thermoplastic keeps performing for years.
5,000+ projects since 2009. VicRoads approved. $20M insured. Here's what that means for you.
AS/NZS 2890, AS 1742 compliant. VicRoads approved. Documentation included.
Weekend or night work available. Your business stays open. Zero downtime.
Traffic control certified crews. We've done 5,000+ sites. Schools to airports to warehouses.
Thermoplastic lasts 5-8 years. Two-pack epoxy for heavy traffic. Not 18-month cheap paint.
Project Completed
Years Experience
Emergency Service
Quality Guaranteed
4.9/5 from 500+ reviews
Results based on typical project outcomes. Individual results may vary.


15/03/2024

22/11/2024

10/10/2024

28/09/2024

15/08/2024

03/07/2024
We've completed 5,000+ projects since 2009, so we've learned what works long-term in Australia's harsh climate. Most contractors use standard-grade thermoplastic that softens in summer heat. We use premium materials rated to 50°C that last 5-7 years, not 2-3 years. We also guarantee zero ghosting on removal work (we learned that one the expensive way in 2016 when a Frankston project cost us $2,800 to fix). Plus, we're VicRoads approved and carry $20M public liability coverage. Every project gets completion photos, material certifications, and AS/NZS compliance documentation. Fixed prices, not estimates that change at invoicing.
Depends on size and complexity. A 200-bay shopping centre carpark typically takes two nights (10pm-6am shifts) to complete without disrupting customers. A warehouse floor with 2,400 linear metres of forklift lanes and pedestrian walkways usually takes 1-3 nights depending on surface condition and required preparation. Smaller facilities like a 50-bay office carpark might be done in one night. Road marking projects vary by traffic management requirements. We'll give you exact timelines in your quote after reviewing your plans. We've completed urgent projects in as little as 8 hours when councils issued compliance orders, though we prefer proper planning for best results.
Absolutely. Most of our carpark and warehouse projects run outside business hours so you don't lose operational time. Shopping centres in Laverton North and Chadstone get marked overnight (10pm-6am windows). Warehouses in Campbellfield and Truganina get done over weekends. We've marked council roads in Ballarat on Sunday nights to avoid weekday traffic disruption. Night shifts aren't glamorous, but that's when the work needs to happen. Our crews are equipped with proper lighting and safety gear for after-hours work. Just tell us your operational constraints and we'll schedule around them.
Councils issue fix-it orders with fines starting at $4,800 (we've seen clients hit with these in Dandenong and Geelong). You also face serious liability exposure if someone's injured due to unclear markings or non-compliant accessible bays. AS/NZS 2890.6 specifies 3.2m minimum width for accessible parking, not 3.0m. That 200mm matters legally. AS/NZS 2890.1 covers general parking dimensions and line visibility. We identify compliance gaps during our site assessment and fix them before councils do. You'll receive documentation proving compliance for your records and insurance requirements.
Yes, we service all Australian states including regional and remote areas. We've completed projects in Ballarat, Bendigo, Shepparton, Warrnambool, Albury-Wodonga, and across regional Victoria. We also service regional NSW, Queensland, Western Australia, South Australia, Tasmania, ACT, and Northern Territory. Travel time and accommodation might add to project costs for remote locations, but we'll quote everything upfront with no surprises at invoicing. Contact us with your location and project details. We'll confirm availability, timeline, and provide transparent pricing within 48 hours.
Upload your site plans, carpark layout, or photos through our online quote form. If you don't have plans, no worries. Send us photos or Google Maps screenshots with approximate dimensions. For warehouse floors, include any areas with oil contamination or surface damage. We'll return a detailed compliance assessment and itemised quote within 48 hours, guaranteed. The quote includes material specifications (thermoplastic, waterborne paint, or epoxy), preparation requirements, timeline, and total fixed price. No estimates that change later. You'll also get recommendations for AS/NZS compliance if we spot gaps. Contact Niel Bennet directly on 0417 460 236 if you need faster turnaround or have questions.
Depends on material choice and traffic volume. Premium thermoplastic in carparks lasts 5-7 years with normal use. Warehouse floor marking with two-pack epoxy lasts 6-8 years even with heavy forklift traffic. Standard waterborne paint on roads lasts 2-3 years before fading. Climate matters too. Western Sydney heat degrades standard materials faster (we learned this the expensive way in 2016). That's why we use UV-stabilized materials rated for Australian conditions. High-traffic areas like shopping centre entries might need touch-ups at 3-4 years. We'll recommend the right material balance between durability and budget for your specific application during quoting.
Everything needed for compliant, long-lasting markings. Site assessment checking surface condition, compliance gaps, and preparation requirements. Surface preparation including pressure cleaning at 3500 PSI, oil contamination removal, crack repairs, and moisture testing. Complete removal of old markings (zero ghosting guarantee). Layout with laser measurements and chalk pilot lines for client approval before committing to paint. Application using premium materials with proper glass bead embedment for visibility. You receive completion photos, material certifications, dimension verification, and AS/NZS compliance documentation for your records. Fixed price quoted upfront covers everything. No hidden costs or surprises at invoicing.
Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.
Or call James directly: 0468 069 002