Line marking crew working on a carpark
Number 1 Platform - Award badge
Australia's Trusted Line Markers

Professional Line Marking Across Australia

Faded lines? Compliance concerns? We've completed over 5,000 carparks, warehouses, and roads since 2009. Upload your site plan and get a fixed-price quote within 48 hours. Fixed pricing. No surprises.

Work Around Your Schedule

Work Around Your Schedule

After Hours? Weekends? Emergency? We're ready 24/7

AS/NZS Compliant

$20M Insured

15+ Years

Since 2009

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

Trusted by Major Australian Operators

Company 4 - Line Marking Australia Client
Company 6 - Line Marking Australia Client
Company 1 - Line Marking Australia Client
Company 5 - Line Marking Australia Client
Company 2 - Line Marking Australia Client
Company 3 - Line Marking Australia Client

5,000+ Line Marking ProjectsAcross Australia Since 2009

AS/NZS 2890.1 compliant markings with proper 3.2m bay widths prevent slips, trips, and collisions

Avoid $4,800+ council fines for non-compliant accessible parking under AS/NZS 2890.6

A Laverton North shopping centre saw parking complaints drop 80% after we remarked 650 bays

Most projects completed in 1-3 nights. 2,400 linear metres finished in eight hours for one Campbellfield warehouse

Error Icon

Compliance Risk

Three Dandenong South facilities copped $4,800+ fines last year. We measure twice, mark once, document everything to AS/NZS 2890.6.

Charger Icon

Fast Turnaround

2,400 metres in eight hours. Most projects wrap in 1-3 nights with zero operational downtime for your facility.

Shield Icon

Durability

Grade A thermoplastic lasts 6-8 years. We learned this the hard way in 2018 when cheaper materials failed after two summers.

Comprehensive Line Marking
Services

From car parks to warehouses, we deliver precision marking that keeps your workspace safe and compliant

Carpark Line Marking

Carpark Line Marking

AS/NZS 2890 compliant bays, accessible parking at proper 3.2m widths. Most projects done over weekends so you stay open.

View details
Road & Traffic Line Marking

Road & Traffic Line Marking

Centre lines, crossings, stop bars. AS 1742 compliant. VicRoads approved. Thermoplastic lasts 5-8 years, not 18 months.

View details
Line Marking Removal

Line Marking Removal

Complete removal using grinding or 3500 PSI water blasting. No ghost lines bleeding through your new layout.

View details
Warehouse & Factory Marking

Warehouse & Factory Marking

Forklift lanes, pedestrian walkways, hazard zones. Two-pack epoxy for high-traffic areas. Scheduled for zero downtime.

View details
Playground & Sports Court Marking

Playground & Sports Court Marking

Courts, games, hopscotch. 12 standard colours or custom matched to your school. Done during holidays, not term time.

View details
Thermoplastic Markings

Thermoplastic Markings

When paint needs replacing every 18 months, thermoplastic keeps performing for years.

View details

Why Line Marking Australia?

5,000+ projects since 2009. VicRoads approved. $20M insured. Here's what that means for you.

Certified & Compliant

AS/NZS 2890, AS 1742 compliant. VicRoads approved. Documentation included.

Fast & Reliable

Weekend or night work available. Your business stays open. Zero downtime.

Expert Team

Traffic control certified crews. We've done 5,000+ sites. Schools to airports to warehouses.

Premium Materials

Thermoplastic lasts 5-8 years. Two-pack epoxy for heavy traffic. Not 18-month cheap paint.

5000+

Project Completed

15+

Years Experience

24/7

Emergency Service

100%

Quality Guaranteed

What Our Clients Say

4.9/5 from 500+ reviews

650-bay carpark remarked over two weekend nights. No trading disruption. Parking complaints dropped 80% in first month per facility manager's report. Best money spent this year.

Laverton North, VIC

Retail Centre Manager

3,800 linear metres marked over three Sunday nights without shutdown. Staff arrived Monday to fresh yellow forklift lanes and white walkways. Zero downtime. Safety manager was impressed.

Truganina, VIC

Logistics Operations Manager

Audit moved up with five days' notice. Accessible bays weren't AS/NZS 2890.6 compliant. Assessed Thursday, quoted Friday, fixed weekend. Passed Monday. Saved us from $15,000+ in fines.

Moorabbin, VIC

Medical Centre Administrator

Four netball courts and playground games done in five days during January break. Kids returned to vibrant blue courts and fresh markings. Fastest turnaround we've seen. Fair enough.

Preston, VIC

School Facilities Manager

Previous contractor's thermoplastic softened by second summer. Total disaster. These guys used Grade A rated to 50°C. Three years later still perfect. Used them for every project since.

Ballarat, VIC

Council Infrastructure Officer

Audit moved Monday to Tuesday. We were stuffed. Called Friday 7pm. Assessed Saturday, quoted lunch, marked Sunday. 2,400 linear metres in eight hours. Auditor found zero issues. Saved us.

Campbellfield, VIC

Warehouse Manager

Accessible bays marked 2.9m not 3.2m. Council fined us $4,800. They came in 48 hours, remarked to AS/NZS 2890.6 specs, provided compliance docs. Fine withdrawn after inspection. Sorted.

Dandenong South, VIC

Property Manager

4.2km road remarking across three suburbs. They handled traffic control, night crews, VicRoads notifications. Five night shifts. Passed inspection first time. Thermoplastic lasts 5-8 years.

Ballarat, VIC

Council Works Department

Airport taxiway needing CASA Part 139 MOS compliance. Night shifts only between flights. Calibrated equipment, worked 11pm-5am three nights, full compliance docs. Aviation auditor found zero issues.

Geelong, VIC

Airport Operations Manager

Hospital carpark but couldn't have fumes near air intakes. Low-VOC materials, 2am-6am windows, coordinated with facilities. Four nights. Zero patient complaints. They understand healthcare.

Clayton, VIC

Hospital Facilities Director

Results based on typical project outcomes. Individual results may vary.

What We Do Best

  • Carpark line marking and AS/NZS 2890 compliant layouts
  • Road and traffic markings with AS 1742 compliance
  • Warehouse walkways, forklift lanes, and safety zones
  • Line marking removal (grinding, water blasting, scarifying)
  • Safety zones, hazard stripes, and loading bays
  • Playground and sports court marking (all court types)
  • Accessible parking at proper 3.2m widths (AS/NZS 2890.6)
  • Directional arrows, stencils, numbering, and lettering
  • Crosswalks and pedestrian safety markings
  • Loading zones, hatching, and keep-clear areas
What We Do Best - Road Marking

Our Recent Projects

Carpark Re-Line & Accessible Bays

Carpark Re-Line & Accessible Bays

15/03/2024

Carpark Line Marking
Council Road & Traffic Marking

Council Road & Traffic Marking

22/11/2024

Road & Traffic Line Marking
Full Surface Line Removal

Full Surface Line Removal

10/10/2024

Line Marking Removal
Warehouse Safety Upgrade

Warehouse Safety Upgrade

28/09/2024

Warehouse & Factory Line Marking
School Playground Repainting

School Playground Repainting

15/08/2024

Playground & Sports Court Marking
Site Compliance Audit & Corrections

Site Compliance Audit & Corrections

03/07/2024

Compliance Audits

Frequently Asked Questions

We've completed 5,000+ projects since 2009, so we've learned what works long-term in Australia's harsh climate. Most contractors use standard-grade thermoplastic that softens in summer heat. We use premium materials rated to 50°C that last 5-7 years, not 2-3 years. We also guarantee zero ghosting on removal work (we learned that one the expensive way in 2016 when a Frankston project cost us $2,800 to fix). Plus, we're VicRoads approved and carry $20M public liability coverage. Every project gets completion photos, material certifications, and AS/NZS compliance documentation. Fixed prices, not estimates that change at invoicing.

Depends on size and complexity. A 200-bay shopping centre carpark typically takes two nights (10pm-6am shifts) to complete without disrupting customers. A warehouse floor with 2,400 linear metres of forklift lanes and pedestrian walkways usually takes 1-3 nights depending on surface condition and required preparation. Smaller facilities like a 50-bay office carpark might be done in one night. Road marking projects vary by traffic management requirements. We'll give you exact timelines in your quote after reviewing your plans. We've completed urgent projects in as little as 8 hours when councils issued compliance orders, though we prefer proper planning for best results.

Absolutely. Most of our carpark and warehouse projects run outside business hours so you don't lose operational time. Shopping centres in Laverton North and Chadstone get marked overnight (10pm-6am windows). Warehouses in Campbellfield and Truganina get done over weekends. We've marked council roads in Ballarat on Sunday nights to avoid weekday traffic disruption. Night shifts aren't glamorous, but that's when the work needs to happen. Our crews are equipped with proper lighting and safety gear for after-hours work. Just tell us your operational constraints and we'll schedule around them.

Councils issue fix-it orders with fines starting at $4,800 (we've seen clients hit with these in Dandenong and Geelong). You also face serious liability exposure if someone's injured due to unclear markings or non-compliant accessible bays. AS/NZS 2890.6 specifies 3.2m minimum width for accessible parking, not 3.0m. That 200mm matters legally. AS/NZS 2890.1 covers general parking dimensions and line visibility. We identify compliance gaps during our site assessment and fix them before councils do. You'll receive documentation proving compliance for your records and insurance requirements.

Yes, we service all Australian states including regional and remote areas. We've completed projects in Ballarat, Bendigo, Shepparton, Warrnambool, Albury-Wodonga, and across regional Victoria. We also service regional NSW, Queensland, Western Australia, South Australia, Tasmania, ACT, and Northern Territory. Travel time and accommodation might add to project costs for remote locations, but we'll quote everything upfront with no surprises at invoicing. Contact us with your location and project details. We'll confirm availability, timeline, and provide transparent pricing within 48 hours.

Upload your site plans, carpark layout, or photos through our online quote form. If you don't have plans, no worries. Send us photos or Google Maps screenshots with approximate dimensions. For warehouse floors, include any areas with oil contamination or surface damage. We'll return a detailed compliance assessment and itemised quote within 48 hours, guaranteed. The quote includes material specifications (thermoplastic, waterborne paint, or epoxy), preparation requirements, timeline, and total fixed price. No estimates that change later. You'll also get recommendations for AS/NZS compliance if we spot gaps. Contact Niel Bennet directly on 0417 460 236 if you need faster turnaround or have questions.

Depends on material choice and traffic volume. Premium thermoplastic in carparks lasts 5-7 years with normal use. Warehouse floor marking with two-pack epoxy lasts 6-8 years even with heavy forklift traffic. Standard waterborne paint on roads lasts 2-3 years before fading. Climate matters too. Western Sydney heat degrades standard materials faster (we learned this the expensive way in 2016). That's why we use UV-stabilized materials rated for Australian conditions. High-traffic areas like shopping centre entries might need touch-ups at 3-4 years. We'll recommend the right material balance between durability and budget for your specific application during quoting.

Everything needed for compliant, long-lasting markings. Site assessment checking surface condition, compliance gaps, and preparation requirements. Surface preparation including pressure cleaning at 3500 PSI, oil contamination removal, crack repairs, and moisture testing. Complete removal of old markings (zero ghosting guarantee). Layout with laser measurements and chalk pilot lines for client approval before committing to paint. Application using premium materials with proper glass bead embedment for visibility. You receive completion photos, material certifications, dimension verification, and AS/NZS compliance documentation for your records. Fixed price quoted upfront covers everything. No hidden costs or surprises at invoicing.

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002