Line marking service hero background

Commercial Car Park Line Marking

Tenant parking, visitor zones, and accessible bays marked to AS/NZS 2890.1 standards. Weekend overnight completion, business as usual Monday. 500+ commercial car parks since 2009. Fixed quotes, no surprises.

AS/NZS 2890.1 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

What is Commercial Car Park Line Marking?

A property manager in Tullamarine called about a 280-bay building where three tenants were threatening lease review over parking disputes. Visitor bays unmarked, accessible spaces too narrow, nobody knew which section belonged to whom.

We quoted Friday, marked the entire carpark over one weekend, and delivered bay allocation diagrams for their lease files Monday morning. Complaints stopped within two weeks.

That's what organised commercial marking delivers. Not just fresh lines. Documentation, compliance, and tenants who stop arguing about parking.

Key Benefits

Organized tenant allocation eliminates parking disputes

Professional appearance that reflects property standards

Maximize parking capacity for tenant requirements

Minimal disruption with weekend or night completion

Accessible parking positioned near lift access

Loading dock and service vehicle separation

Visitor parking clearly identified and numbered

Executive and reserved parking properly designated

Commercial Car Park Line Marking
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

Residential

Commercial Car Park Layout & Design

AS/NZS 2890.1:2021 Parking bay dimensions, aisle widths, and turning circles for office building car parks including gradient and drainage requirements.

Residential

Accessible Parking Near Office Entries

AS/NZS 2890.6:2009 Commercial buildings need accessible bays within 50m of accessible entries (typically near lifts). Minimum 3.2m bay width with compliant access aisles.

Residential

Pedestrian Safety & Crossing Points

AS/NZS 1428.1:2009 Crossings between car park sections and building entries must have clear markings, proper visibility, and meet accessibility standards.

Residential

Loading Dock & Service Vehicle Zones

AS/NZS 2890.1, AS/NZS 2890.3 Separate marking for delivery vehicles, waste collection, and service access. Must accommodate truck turning circles and loading/unloading operations.

Residential

Fire Emergency Access & Hydrant Zones

AS 2444, Building Code of Australia Fire lanes, hydrant access points, and emergency assembly areas must remain clear with high-visibility marking.

Residential

Bicycle Parking & End-of-Trip Facilities

AS/NZS 2890.3:2015 Many commercial developments require bicycle parking facilities with clear marking for cycle lanes and storage areas.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

What Our Clients Say

4.9/5 from 500+ reviews

650-bay shopping centre carpark remarked over two weekend nights. Centre stayed open, customers didn't notice. Parking complaints dropped 80% in first month according to security logs. Best investment this year.

Laverton North, VIC

Shopping Centre Manager

Body corporate wanted 48 bays plus visitor signage done before AGM. Completed Saturday night, no disruption to residents, compliance documentation ready Monday morning. Committee was impressed. We've used them for three complexes since.

Narre Warren, VIC

Strata Manager

Custom numbered bays, directional arrows, and company logo stencilled at main entrance. 180 bays completed overnight, building open as normal next morning. Clean edges, perfect alignment. Tenants actually commented on it. Doesn't happen often.

Melbourne CBD, VIC

Property Manager

Council needed 23 accessible bays upgraded to current AS/NZS 2890.6 standards across four car parks. Completed in two weeks, full compliance documentation, zero public complaints. Budget came in under quote. Rare these days.

Gold Coast, QLD

Council Assets Manager

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0468 069 002

Frequently Asked Questions

We use several approaches depending on your property management system. Most common: sequential numbering (Bay 1, 2, 3 etc.) with a separate allocation list managed by property management. Alternative: tenant-specific numbering (e.g., Suite 401 gets Bays 401-405). We've also done colour-coded zones where Tenant A has blue-numbered bays, Tenant B has green-numbered bays etc. A business park in Bundoora had six separate tenants. We numbered bays sequentially but used floor-mounted reflectors matching tenant colours to help visitors identify which section belonged to each business.

That's our standard approach for commercial buildings. We've completed dozens of office car parks using Friday night through Sunday completion schedules. A typical 200-bay office building takes one weekend (Friday 6pm through Sunday 6am). We section the work so tenants leaving Friday afternoon can retrieve their vehicles, mark overnight Friday/Saturday, allow curing time Saturday, complete final sections Saturday night/Sunday, and have everything ready for Monday 7am arrivals. Property managers tell us tenants often don't even realize we've remarked until they notice the fresh lines.

Moderate commercial traffic (200-400 vehicle movements daily) sits between residential and shopping centre intensity. We typically recommend waterborne acrylic paint for most of the car park with thermoplastic for specific high-wear zones (main entry lanes, tight turning points, heavily-used visitor sections). A business park in Scoresby wanted to save money by using standard paint everywhere. We recommended thermoplastic just for the main entry circle where all traffic concentrated. Three years later the thermoplastic entry still looks perfect while we've repainted the outer sections once. The blended approach balances cost with durability.

AS/NZS 2890.6 specifies ratios based on total parking capacity. For commercial office buildings: 1 accessible bay per 50 standard bays for the first 500 bays. So a 200-bay office building needs minimum 4 accessible bays. These must be located within 50m of an accessible building entry (usually near the main lift). Each accessible bay requires 3.2m width (not 2.4m), and pairs of accessible bays share a 2.4m access aisle between them. We'll calculate your exact requirements and identify the best locations based on your building entries and lift access points.

king projects when tenants change or property managers want to refresh specific zones. Common scenario: a major tenant leaves and their 30 allocated bays need renumbering for new smaller tenants. We remove the old numbers using water blasting or grinding (prevents ghosting), repaint those specific bays, and apply new numbers. The fresh paint might be slightly brighter than older sections, but it blends within 2-3 months of UV exposure. A commercial building in Tullamarine had us remark just the visitor section (45 bays) when they reorganized tenant allocations. Saved them 60% versus remarking the entire 280-bay car park.

Yes. Commercial property managers need documentation for tenant lease schedules, building compliance records, and annual reporting. After completion you receive: completion photos of all marked areas, material certifications showing compliance with AS/NZS standards, dimension verification measurements, bay numbering layout diagram, and compliance certificate for your building file. Some property managers want this for lease agreements showing allocated parking bays. We've provided detailed diagrams for commercial lease schedules showing exactly which bays belong to which tenant.

Related Services

Hospital Line Marking That Keeps Patients Safe

Hospital Line Marking That Keeps Patients Safe

Professional hospital line marking across Australia. Emergency access, ambulance bays, accessible parking, drop-off zones. Upload plans for fast quote.

View details
Shopping Centre Compliance Line Marking

Shopping Centre Compliance Line Marking

Professional shopping centre compliance line marking. AS/NZS 2890 accessible parking, fire zones, loading docks, safety marking. Upload plans for quote today.

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002