Line marking service hero background

Warehouse Line Marking Campbellfield

Professional warehouse floor marking for Campbellfield's northern industrial precinct.

AS 1742.2 Compliant

Fully Insured

24/7 Availability

15+ Years Experience Award

15+ Years

Get FREE Quote

Fixed-Price Quote Within 48 Hours

Trusted by 5,000+ Businesses

Upload site plans or photos (optional)

PDF, JPG, PNG, DWG (Max 10MB each)

Why Campbellfield Warehouse Floor Marking?

A warehouse manager in Campbellfield called us at 7pm on a Friday. Their Monday morning safety audit had been moved up to Tuesday. The forklift lanes were faded beyond recognition. Pedestrian walkways? Barely visible. They needed help fast or faced potential shutdown if markings were not fixed.

We assessed the site Saturday morning, quoted by lunch, and had a crew marking the floor Sunday night. 2,400 linear metres completed in one eight-hour shift. The audit passed Tuesday with zero recommendations on floor marking. That is the kind of turnaround we are set up for.

Campbellfield forms part of Melbourne's northern industrial corridor along the Hume Highway. Major distribution centres, manufacturing facilities, and logistics operations cluster in this precinct. Heavy forklift traffic is standard throughout operating hours.

The industrial concentration means we have crews in the northern corridor regularly. Response times for assessments are quick. Familiarity with local facilities helps us understand typical requirements and provide accurate quotes rapidly.

Forklift safety is the primary concern in Campbellfield warehouses. Yellow lanes establish vehicle travel paths. White pedestrian walkways keep workers separate from forklift movements. Intersection treatments manage crossings. Red exclusion zones mark areas of particular danger.

Storage organisation supports efficiency alongside safety. Pallet locations ensure consistent placement. Staging areas have clear boundaries. Quarantine zones isolate inspection-required items. Fresh floor marking brings order to operations that may have drifted from organised systems.

Loading dock areas in Campbellfield facilities handle constant truck movements. Clear bay marking helps drivers position correctly. Guide lines assist reversing. Pedestrian exclusion protects workers around active docks. Staging areas near docks have defined limits.

Product selection for Campbellfield warehouses depends on traffic patterns. High-traffic forklift areas need heavy-duty materials. Two-pack epoxy withstands constant rubber-wheeled traffic far better than standard paint. We assess each zone and recommend appropriate products.

Surface preparation determines longevity. Campbellfield warehouse floors accumulate oil from years of forklift operations. Dust and residue build up. We pressure wash and degrease before marking. Where existing coatings are failing, we remove them before fresh application.

Audit deadlines create pressure that we understand. WorkSafe inspections, client audits, and insurance reviews often have fixed dates. We can mobilise quickly for urgent situations. Weekend and night work is standard for facilities facing tight timelines.

Emergency escape routes need clear marking throughout all facilities. Fire exits, assembly point directions, and emergency equipment locations require visible floor marking. We include emergency marking in every warehouse scope regardless of timeline pressure.

Compliance documentation is particularly important for audits. We provide completion photographs, layout diagrams, and material specifications. This documentation demonstrates due diligence and provides evidence for inspectors and auditors.

Many Campbellfield facilities benefit from maintenance programs. Regular touch-ups maintain safety standards and prevent the kind of deterioration that triggers urgent remediation. Proactive maintenance costs less than emergency weekend marking.

Our coverage extends throughout the northern corridor including Somerton, Thomastown, Epping, and surrounding suburbs. Crews familiar with these areas respond quickly to assessment requests.

For warehouse floor marking in Campbellfield, urgent or scheduled, upload your plans or contact Niel directly. We can assess your requirements and provide scope matching your timeline.

Key Benefits

Fast audit turnaround

Weekend completion available

Heavy-duty materials

WorkSafe Victoria compliant

Northern corridor coverage

Full compliance documentation

Campbellfield Warehouse Floor Marking
Site Inspection Icon - Building Assessment

Site Inspection

Free assessment and detailed quote

Professional Marking Icon - Expert Application

Professional Marking

Expert application with premium materials

Quality Assurance Icon - Compliance Verification

Quality Assurance

Final inspection and compliance sign-off

Compliance Standards

paint roller

AS 4586

Slip resistance classification for pedestrian surfaces.

paint roller

AS/NZS 1428.1

Design for access and mobility requirements.

paint roller

Safe Work Australia

Workplace traffic management guidelines.

paint roller

WorkSafe Victoria

Victorian workplace safety requirements.

paint roller

AS 1318

Industrial safety colour coding standards.

paint roller

AS 4049

Road marking paint materials and durability.

Fully Compliant & Certified

All our work meets or exceeds Australian Standards and state road authority requirements

VicRoads Approved

Registered Contractor

$20M Public Liability

$10M Professional Indemnity

5,000+ Projects

Since 2009

Fixed Prices

Not Estimates

AS 1742

Traffic Control Devices

Specifies line colours, widths, arrow designs, and placement for road markings. Ensures all traffic control devices meet national safety standards.

AS/NZS 2890

Parking Facilities

Covers bay dimensions (2.4m × 5.4m standard, 3.2m × 5.4m accessible), aisle widths, and traffic flow requirements for compliant parking areas.

AS 4586

Slip Resistance

Defines slip resistance classifications (P rating) for pedestrian surfaces. Critical for wet areas, ramps, and high-traffic zones.

AS/NZS 1428

Access & Mobility

Sets requirements for accessible parking bays, tactile indicators, and mobility access. Essential for DDA compliance and accessibility audits.

What Our Clients Say

4.9/5 from 500+ reviews

Full warehouse floor marking before safety audit. Assessed Thursday, quoted Friday, completed Sunday night. 2,400 linear metres in one eight-hour shift. Audit passed with zero recommendations. That's the turnaround you need.

Campbellfield, VIC

Logistics Operations Manager

Forklift lanes, pedestrian walkways, hazard zones, equipment boundaries. Entire factory floor done in one 10-hour overnight shift. Production started Monday morning as normal. Zero downtime. Safety manager signed off immediately.

Derrimut, VIC

Plant Manager

Previous layout completely wrong. They ground off everything using diamond grinders, no ghosting, no shadows visible. New markings went down perfectly on clean surface. Should have called them first. Lesson learned.

Truganina, VIC

Facility Manager

High-traffic warehouse entrance was destroying standard paint every six months. They recommended Grade A thermoplastic rated to 50°C. Three years later still looks fresh. Should have done it from the start. Worth every dollar.

Somerton, VIC

Warehouse Manager

Distribution centre floor marking completed over Christmas shutdown. 3,800 square metres, forklift lanes, pedestrian zones, loading dock boundaries. Crew flew in, job done in three nights. Back to operations Boxing Day. Smooth as.

Wetherill Park, NSW

Operations Director

Results based on typical project outcomes. Individual results may vary.

Upload your site plans for a detailed quote within 48 hours

Get an accurate, fixed-price quote tailored to your specific project requirements

Call: 0468 069 002

Frequently Asked Questions

For urgent situations, we can often assess within 24 hours, quote same day, and mobilise crews immediately. Weekend work is standard for facilities facing Monday audits. We understand that audit dates cannot move.

Often yes, depending on scope. We have completed 2,400 linear metres in single overnight shifts for urgent situations. Larger facilities may need multiple shifts but we schedule to meet your deadline.

We supply completion photographs, layout diagrams, and material specifications. This documentation demonstrates due diligence and provides evidence that WorkSafe inspectors and client auditors require.

Yes. Our coverage extends throughout the northern industrial corridor including Somerton, Thomastown, Epping, Broadmeadows, and surrounding suburbs. Crews familiar with these areas respond quickly.

Two-pack epoxy withstands constant rubber-wheeled traffic far better than standard paint. It costs more but lasts significantly longer in high-traffic areas. We assess traffic patterns and recommend appropriate products.

Yes. Regular maintenance programs include periodic inspections and touch-ups before marking deteriorates to audit-failure levels. Proactive maintenance costs less than emergency remediation and maintains consistent safety.

Related Services

Warehouse Line Marking Tullamarine

Warehouse Line Marking Tullamarine

Professional warehouse line marking in Tullamarine. Forklift lanes, safety zones, pedestrian paths. WorkSafe compliant. Free quotes.

View details
Warehouse Line Marking Epping

Warehouse Line Marking Epping

Professional warehouse line marking in Epping. Forklift lanes, safety zones, pedestrian paths. WorkSafe compliant. Free quotes.

View details
Carpark Line Marking Tullamarine

Carpark Line Marking Tullamarine

Professional carpark line marking in Tullamarine. Industrial, logistics, commercial facilities. AS/NZS 2890 compliant. Free quotes.

View details

Ready to Get Your Line Marking Sorted?

Upload your site plans and receive a fixed-price quote within 48 hours. No surprises, no cost blowouts, just clear pricing you can take to your committee or manager.

Call Now: 0468 069 002

Or call James directly: 0468 069 002